Standard Items on all Pools:
- #3 ReBar tied on 12” centers, 6” centers on all transitions, 3 ring bars
- Gunite shell – 6” walls, 9” floors, 12” bond beam
- Benches/swimouts (if desired)
- Steps
- Coping
- Ceramic tile (many color choices available)
- White plaster
- At least 2 skimmers
- At least 5 return lines
- At least 1 main drain
- At least 2 horsepower pump
- Filter?
- Dual time clocks for pool and pumps
- Maintenance equipment (pole, brush, net, etc)
- Freeze protection thermostat
- First chemical supply
- Operation instruction course
|
Optional Items Available:
- Raised beams
- Computerized controls
- Heater
- Safety covers
- Gunite spa
- Fiberoptic lighting
- Sheer descents
- Negative edges
- Colored plaster
- PebbleTec interior finish
- Rock waterfalls
- Extra decking
|